• No.48,Jalan Burhanuddin Helmi 2,Taman Tun Dr. Ismail,60000 Kuala Lumpur.
  • havilahresources@gmail.com
  • 016-220 4173

Our Project

Highlightes Projects

With a rich portfolio of diverse projects, our project references showcase our expertise and experience in delivering exceptional solutions. Each project represents our commitment to excellence, as we consistently strive to meet and exceed the expectations of our clients. From geophysical surveys to geological mapping and site assessments, our project references demonstrate our ability to tackle complex challenges and provide valuable insights for informed decision-making. Explore our project references and discover how we have successfully contributed to a wide range of industries and sectors.

01

WATER RECTICULATION WORKS AT PACKAGE 4 - THE PROPOSED UPGRADING AND REHABILITATION WORKS AT PANTAI WTP, LAKAI WTP, SG. TERIP BALANCING RESERVOIR, BUKIT PERMATA RESERVOIR AND RELATED WORKS.
DATO LOW BAN HIN (BAN HIN ELECTIRCAL AND CONSTUCTION S/B)
2013

02

MICRO PILING WORK AT BUKIT PERMATA RESERVOIR AND LAKAI WTP FOR PACKAGE 4- PROPOSED OF UPGRADING AND REHABILITION WORKS AT PANTAI WTP, LAKAI, SG TERIP BALENCING RESERVOIR
DATO LOW BAN HIN
(BAN HIN ELECTIRCAL AND
CONSTUCTION S/B)
2013

03

KVMRT-MICROPILE WORKS FOR SECTION 16 ENTRANCE A&B, PUSAT BANDAR DAMANSARA ENTRANCE A&B AND SEMANTAN ANCILLARY BUILDING
MR. GOH AH SOON
EAGLE ENGINEERING & TRADING S/B
2013

04

CADANGAN PEMBANGUNAN 2 BLOCK BANGUNAN PEJABAT DAN HOTEL SETINGGI 27 TINGKAT (BLOCK A) DAN 25 TINGKAT (BLOCK B) SERTA 1 TINGKAT SKY GARDEN DI ATAS TINGKAT PODIUM PERNIAGAAN, 3 TINGKAT BAWAH RENDAH DAN 3 TINGKAT BASEMENT TEMPAT LETAK KERETA SERTA STESEN PENGCECAS KENDERAAN ELEKTRIK DI ATAS LOT 55, JALAN UTARA, SEKSEN 52, PETALING JAYA. SELANGOR DARUL EHSAN
MR. CHARLES YONG
METBUILD SDN BHD
2014

05

CADANGAN PINDAAN KEPADA PELAN KELULUSAN
MBPJ/1201/T10/1374/2007 BERTARIKH 21 SEPT DAN FEB2010 UNTUK 1 BLOCK MENARA PEJABAT 13 TINGKAT FASA3 YANG MENGANDUNGI 7 UNIT KEDAI TINGKAT BAWAH DAN 239 UNIT PEJABAT DARI TINGKAT 1 KE TINGKAT 12 DARIPADA PEMBANGUNAN KOMERSIAL YANG MENGADUNGI : 5 BLOCK KEDAI PEJABAT 3 TINGKAT (62 UNIT) DI ATAS
LOT 24545 (PT11540)
(UNDERPINNING WORKS)
MR. CHARLES YONG
METBUILD S/B
2014

06

KERJA-KERJA MEMBAIKI PULIH JAMBATAN DARI PULAU TUBA KE PULAU DAYANG BUNTING, LANKAWI. KEDAH DARUL AMAN
EN. AZIZAN
JKR HQ,
BAHAGIAN FORENSIK
2014

07

CADANGAN KERJA- KERJA TANAH BAGI LOT PT 22872- 22958, 23018, 23021,22961,22964-23016, 22959-22960, 22962-22963, MUKIM DAMANSARA, DAERAH PETALING JAYA, SELANGOR
• MICROPILING WORK FOR (300MM DIAMETER, 550MM DIAMETER)
• SOIL NAIL
• GEOGRID WALL
DATO’ LAW BAN HEE
B&G ENGINEERING SDN BHD
(FOR KINGLEYS HILL SDN BHD)
2014

08

ROCK STABILIZATION WORK WITH ROCK BOLT, GUNITING FOR SLOPE IN TAMAN BUKIT ANGGERIK, CHERAS. KUALA LUMPUR
EAGLE ENGINEERING S/B
2014

09

SLOPE AND ROCK SLOPE STABILIZATION WORK FORESTA 2, SRI DAMANSARA
SRI DAMANSARA S/B
2014

10

KINGSLEY HILL MICROPILE WORKS AT PHASE 1 FOR SEMI –D UNIT (ACCUMULATE FROM ALL LOTS IN PHASE 1)
B&G CORPORATION SDN BHD
2014

11

FOUDATION WORK FOR GM KLANG
GM KLANG
2014

12

CADANGAN PEMBANGUNAN 3BLOK PANGSAPURI DI ATAS LOT 2086 DAN 1929 MUKIM CHERAS, DAERAH HULU LANGAT, SELANGOR
2014

13

KELAB GOLF NEGARA SUBANG THE EXECUTION AND COMPLETION OF BUILDING RETAINING WALL ON ROAD LEADING TO PARKING 5 BAY AT KELAB GOLF NEGARA SUBANG
KELAB GOLF NEGARA
SUBANG
2015

14

ST. REGIS LANGKAWI,PULAU LANGKAWI, KEDAH DARUL AMAN CLIENT MICROPILE WORKS
SSANGYONG ENGINEERING & CONSTRUCTION CO.LTD
2015

15

CADANGAN MENJALANKAN KERJA- KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI JALAN DESA MURNI, TAMAN DESA, KUALA LUMPUR
CAG MAJUBINA SDN BHD
2015

16

MICROPILE 300MM WORKS AT JALAN PAHANG
IKHMAS JAYA SDN BHD
2015

17

SITE INVESTIGATION : CIVITAS 1 GOHTONG JAYA ,GENTING HIGHLANDS
GENTING DEVELOPMENT SDN BHD
2015

18

EARTHWORKS AND ANCILLARY WORKS : VILLA 1 & 2 GOHTONG JAYA, GENTING HIGHLANDS
GENTING DEVELOPMENT SDN BHD
2015

19

EARTHWORKS , ANCILLARY WORKS AND RC WALL WORKS : SHELL STATION GOHTONG JAYA, GENTING HIGHLANDS
GENTING DEVELOPMENT SDN BHD
2015

20

MICROPILE WORKS : MENAIKTARAF JALAN DARI RPS LEGAP KE KG ORANG ASLI BESWOK SG.SIPUT (U) KUALA KANGSAR PERAK
SETIA SURVEY SDN BHD
2015

21

BUILDING & EXTERNAL WORKS FOR CADANGAN TAMBAHAN KEDAI SERBAGUNA DI TINGKAT 1 SERTA RUANG PERNIAGAAN DI TINGKAT 2 KEPADA SEBUAH STESEN MINYAK DI ATAS PT 21841 GOHTONG JAYA,GENTING HIGHLANDS, PAHANG
GENTING DEVELOPMENT SDN BHD
2016

22

CADANGAN PEMBINAAN 1 BLOK PUSAT KOMUNITI 2 TINGKAT DAN 1 BLOK DEWAN SERBAGUNA 1 TINGKAT DI ATAS LOT 4953 (LOT PT1062) DAN SEBAHAGIAN TANAHH KERAJAAN (PLOT A) JALAN SETIAWANGSA MUKIM HULU KELANG, KUALA LUMPUR
BAN HIN ELECTRICAL & CONSTRUCTION SDN BHD
2016

23

CADANGAN PEMBINAAN PERUMAHAN DI ATAS LOT PT14370-15539 & PT16036, DI BANDAR EKAR RANTAU, MUKIM RANTAU DAERAH SEREMBAN, NEGERI SEMBILAN
BINA TERBIT SDN BHD
2017

24

SLOPE STABILIZATION FOR ROCK AND SOIL SLOPE FOR LENGTH 134M FROM GUARD HOUSE FOR DESA DAMANSARA ALONG JALAN SETIAKASIH
DAMANSARA MANAGEMENT CORPORATION
2017

25

DISMANTLING OF EXISTING MINIMUM OIL CIRCUIT BREAKER AND TO SUPPLY , INSTALL TEST AND COMMISION NEW 145Kv CIRCUIT BREAKER AT PMU NKST~MICROPILING
TITISAN EMBUN ENGINEERING
2017

26

PAKEJ D44- PEMBINAAN RANGKAIAN PAIP PEMBENTUNGAN DI BUNUS, KUALA LUMPUR- CONSTRUCTION & COMPLETION OF CONTIGUOUS BOREPILES WORK FOR KLR030
CWM GROUP SDN BHD
2017

27

PRIVASATION, OPERATION AND MAINTENANCE OF KUALA LUMPUR KARAK HIGHWAY-PROPOSED REMEDIAL WORKS AT KM 52.40 WB, KL-KARAK HIGHWAY (DEBRIS BARRIER WORKS)
ALLOY MAINTENANCE ENGINEERING SDN BHD
2017

28

PROJECT JALAN AKSES KE EMPANGAN BALEH, BAHAGIAN KAPIT, SARAWAK-PAKEJ FASA 1,PEMBINAAN JALAN DARI KM0.00-KM5.00 PEMBINAAN JAMBATAN NG BUNYAU, JAMBATAN NG MUJONG DAN KERJA – KERJA BERKAITAN
SYARIKAT USAHA TULIN SDN BHD
2017

29

CADANGAN MENJALANKAN KERJA- KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI JALAN 14/144A & JALAN 11/144A TAMAN BUKIT CHERAS WILAYAH PERSEKUTUAN KUALA LUMPUR
CAG MAJUBINA SDN BHD
2017

30

PROPOSED SLOPE PROTECTION WORKS FOR CADANGAN PEMBANGUNAN KOMPLEKS IMIGRESEN, KASTAM, KUARANTIN DAN KESELAMATAN (ICQS) SECARA BERSEPADU DI BUKIT KAYU HITAM KEDAH DARUL AMAN
DEKAD KALIBER SDN BHD(DRB HICOM)
2017

31

KERJA-KERJA MEMBAIKPULIH MENDAPAN STRUKTUR TAPAK ASAS DI LAPANGAN SUIS PMU 500kV JANAMANJUNG BAGI PEJABAT PENGURUS NEGERI (PERAK), JABATAN SENGGARAAN ASET,BAHAGIAN PENGHANTARAN, TNB.
KI ENGINEERING
S/B
2017

32

KERJA - KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI ATAS LOT 150, PERSIARAN SYED PUTRA 5,
BUKIT ROBSON, KL
PROGOVIEW SDN. BHD.
2017

33

KERJA-KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI CERUN BUKIT AMAN – KTM, KUALA LUMPUR.
SOIL NAILING WORKS
PROGOVIEW SDN. BHD.
2017

34

TRX – TUN RAZAK EXCHANGE LIFESTYLE
BACHY SOLETANCHE (M) SDN. BHD.
2017

35

MASS RAPID TRANSIT LALUAN 2 SUNGAI BULOH – SERDANG – PUTRAJAYA (SSP) MRT2 PACKAGE V202 (MICRO PILE WORKS )
SN AKMIDA HOLDING S/B
2018

36

MASS RAPID TRANSIT LALUAN 2 SUNGAI BULOH – SERDANG – PUTRAJAYA (SSP) MRT2 PACKAGE V203 (MICRO PILE WORKS )
DUTA WAJAR S/B
2018

37

MASS RAPID TRANSIT LALUAN 2 SUNGAI BULOH – SERDANG – PUTRAJAYA (SSP) MRT2 PACKAGE S203 (CANTONMENT) (MICRO PILE WORKS )
DUTA WAJAR S/B
2018

38

CADANGAN MENJALANKAN KERJA-KERJA PEMBAIKAN CERUN DAN SISTEM PERPARITAN DI JALAN 16/142, TAMAN ORKID DESA, CHERAS KUALA LUMPUR. (ROCK SLOPE TREATMENT WORKS)
COL ENGINEERING S/B
2018

39

THE CONSTRUCTION OF OPERATOR’S VILLAGE FOR BALEH HYDROELECTRIC PROJECT (SUPPLY & INSTALL BORED PILE & MIRCO PILES)
SARAWAK ENERGY BERHAD (PJA TRINITY)
2018

40

KERJA-KERJA PEMBAIKAN JEJANTAS SUSUR 6, JALAN TUN RAZAK, JOHOR
IDIQA HOLDING S/B
2018

41

PROPOSED 3M HEIGHT 750KJ ROCKFALL BARRIER AT BUKIT GAMBIR, PENANG FOR METRIO HILL SDN BHD
METRIO HILL S/B
2018

42

PROPOSED 3M HEIGHT 750KJ ROCK FENCE AT BUKIT JAMBUL, PENANG FOR WORLDWIDE VENTURES SDN BHD
WORLDWIDE VENTURES S/B
2018

43

KERJA-KERJA PENYELENGGARAAN BERKALA DI JALAN TAMAN SETIAWANGSA, TAMAN SETIAWANGSA, KL DAN JALAN BUKIT SETIAWANGSA (SLOPE D), TAMAN SETIAWANGSA
CAG MAJUBINA S/B
2019

44

CADANGAN MEMPERTINGKATKAN SISTEM PERPARITAN INDUK DAN SISTEM, PENGURUSAN AIR HUJAN DI TAMAN BUKIT MAS KUALA LUMPUR (2019/A134)
ERAT UTAMA S/B
2020

45

KERJA KECEMASAN DAN MEMBAIKPULIH MENDAPAN TAPAK ASAS STRUKTUR PERPASANGAN GAS INSULATED LINE (GIL) OMU JANAMANJUNG, BAGI PERJABAT HEAD (GRID MAINTENANCE - NORTH), JABATAN GRID MAINTENANCE, BAHAGIAN GRID TNB
KI ENGINEERING S/B
2020

46

PROJECT : CADANGAN PEMBANGUNAN 7 UNIT KEDAI PEJABAT YANG MENGANDUNGI 5 UNIT 2 TINGKAT (24' x 80'), 2 UNIT 3 TINGKAT (34' x 80'), BESERTA 1 UNIT RUMAH SAMPAH DAN 1 UNIT PENCAWANG PADAT DI ATAS PT 47291 SELUAS 1.398 EKAR, JALAN BUKIT MELAWATI U17/10, SAUJANA PERMAI, SEKSYEN U17, 40160 SHAH ALAM, SELANGOR DARUL EHSAN
JOHAWAKI
2021

47

CADANGAN PEMBANGUNAN BERSTRATA RUMAH KOS TINGGI BERJUMLAH 235 UNIT DI FASA 7 DI ATAS LOT PT 3543 DAN 1538, FASA 7 (TAPAK C), PANTAI HILLPARK, KAMPUNG KERINCHI, KUALA LUMPUR
YTL LAND
2022

48

PROJECK MASS RAPID TRANSIT LALUAN 2 JAJARAN SUNGAI BULOH- SERDANG- PUTRAJAYA: THE CONSTRUCTION AND COMPLETION OF ROADWORKS, DRAINAGE WORKS AND ASSOCIATED WORKS AT CONLAY STATION
• External & Drainage Works
GAMUDA GEO
2022

49

PROPOSED ROCK SLOPE REHABILITATION WORKS AT SKIM 1,
TAMAN PUNCAK INDAH ON LOT 1287, SEKSYEN 14, BANDAR AMPANG,
DAERAH HULU LANGAT, SELANGOR
GRANDSTEP DEVELOPMENT S/B
2022

50

CADANGAN MEROBOH DAN MEMBINA SEMULA 1 UNIT RUMAH SESEBUAH DUA TINGKAT SEDIA ADA DI ATAS LOT 65328, JALAN BK 6B/2, BANDAR KINRARA 6, PUCHONG, MUKIM PETALING, DAERAH PETALING, SELANGOR
MR. SHUM CHOO SENG
2022

51

PROPOSED ADDITIONAL TANKS AT ANCOM-CHEMQUEST TERMINALS SDN.BHD AT WEST PORT, SELANGOR DARUL EHSAN
TURCOMP ENGINEERING S/B
2022

52

REPAIR AND MITIGATION WORKS OF KENYIR DAM EMERGENCY RESPONSE (IMMEDIATE WORK)
LLC BERHAD
2023

53

CADANGAN MENJALANKAN KERJA-KERJA PEMBAIKAN TEMPOK PENAHAN DAN SISTEM PERPARITAN DI JALAN SEPADU 6 TAMAN UNITED, KUALA LUMPUR
CAG MAJUBINA S/B
2024

Let's get in touch and build projects!

  • No.48, Jalan Burhanuddin Helmi 2, Taman Tun Dr. Ismail, 60000 Kuala Lumpur.
  • havilahresources@gmail.com
  • 016-220 4173
Powered by Infinitas Technologies (M) Sdn. Bhd.